Project cost guide

Reviewing a Project Cost Estimate

A review should test the estimate’s logic and evidence, not merely confirm that the spreadsheet adds correctly.

Scope and technical checks

  • Does the estimate match the latest design and schedule?
  • Are interfaces, temporary work, testing and closeout included?
  • Are exclusions explicit and reasonable?

Data and method checks

  • Are rates, quantities and productivity supported?
  • Were historical costs normalized?
  • Are formulas, units and currencies consistent?
  • Does estimate detail match project maturity?

Risk and reconciliation checks

  • Are base cost, escalation and contingency separated?
  • Are major risks reflected once, not twice?
  • Can changes from the previous estimate be explained?
  • Do summary totals reconcile to supporting detail?

Independent review

Independence can range from peer checking to a separate estimate. The level should match decision importance, novelty, uncertainty and potential consequences.

Review output: document findings, material adjustments, unresolved issues and the estimate’s recommended use—not just a pass/fail label.